Scheduled service maintenance on November 22


On Friday, November 22, 2024, between 06:00 CET and 18:00 CET, GIN services will undergo planned maintenance. Extended service interruptions should be expected. We will try to keep downtimes to a minimum, but recommend that users avoid critical tasks, large data uploads, or DOI requests during this time.

We apologize for any inconvenience.

Cronologia Commit

Autore SHA1 Messaggio Data
  asobolev aefb15ddf4 fixes to the sound presentation loop - include continuous sound stream part 1 8 mesi fa
  asobolev 6400ec29e7 merged changes 1 anno fa
  asobolev f0dc4e95ba added RAW video writer 1 anno fa
  miguel_bengala 95913b244b Add functionality of dropping multiple pellets 1 anno fa
  miguel_bengala ede8eb4e18 Write start time of audio recording to csv file 1 anno fa
  miguel_bengala 901788837f Make changes to the default.json to include microphones section 1 anno fa
  asobolev 7ce7d7cff6 fixes for timing of controllers start 1 anno fa
  asobolev 4483e62bc9 Merge branch 'master' of https://gin.g-node.org/asobolev/runSIT 2 anni fa
  asobolev e9d13106cc added save_contours param to defaults 2 anni fa
  Andrey Sobolev c874b69a40 some fixes 2 anni fa
  asobolev 8ceb05744f fixed HD angle computation in position controller 2 anni fa
  asobolev 50ea29f8be removed animal contours from video 2 anni fa
  asobolev 53e1de7446 updated parameters for HD tracking 2 anni fa
  asobolev ed9abfea64 added HD tracking, need more testing 2 anni fa
  dianamaro 26eacb194b included continuous sound option 2 anni fa
  dianamaro 6d05db29e0 merged all protocols in one SIT notebook 2 anni fa
  dianamaro 562ec29669 implemented variable pulse duration 2 anni fa
  dianamaro bc8b8bc928 bugfix in position estimation 3 anni fa
  asobolev 7a7224b28a refactoring position controller for data in meters 3 anni fa
  dianamaro a40e3e9d9f moved settings to profiles 3 anni fa