Scheduled service maintenance on November 22


On Friday, November 22, 2024, between 06:00 CET and 18:00 CET, GIN services will undergo planned maintenance. Extended service interruptions should be expected. We will try to keep downtimes to a minimum, but recommend that users avoid critical tasks, large data uploads, or DOI requests during this time.

We apologize for any inconvenience.

Jack e719b3df65 add 00 to 03 9 달 전
..
01-power_analysis.R e719b3df65 add 00 to 03 9 달 전
02-power_results.R e719b3df65 add 00 to 03 9 달 전
README.md e719b3df65 add 00 to 03 9 달 전
power.csv e719b3df65 add 00 to 03 9 달 전
power.pdf e719b3df65 add 00 to 03 9 달 전
power.png e719b3df65 add 00 to 03 9 달 전
power_corr_vals.pdf e719b3df65 add 00 to 03 9 달 전
power_corr_vals.png e719b3df65 add 00 to 03 9 달 전
power_onetailed.pdf e719b3df65 add 00 to 03 9 달 전
power_onetailed.png e719b3df65 add 00 to 03 9 달 전
stim_tidy_long.csv e719b3df65 add 00 to 03 9 달 전

README.md

This folder contains the data and code for running the power analysis.

.
|-- 01-power_analysis.R: Code for running the power analysis.
|-- 02-power_results.R: Code for analysing the results of the power analysis.
|-- power.csv: Simulation results from 01-power_analysis.R.
|-- power.png: Relationship between N and power.
|-- power_corr_vals.png: Relationship between N and power for different random effect correlations.
|-- power_onetailed.png: A simplified figure showing the power curve for one-tailed comparisons only.
`-- stim_tidy_long.csv: Picture-word stimuli (long format), with useful variables for each item.